Followings are applicable when procedures based on laws or ordinances, etc. are required.
Flow of Procedures−Advance Guidelines Concerning Construction of Large-sized Buildings
|
Construction Planning of Large-sized Building which Require Advance Consultation. |
◯
|
Applicable Areas
Urbanization promotion areas, urbanization control areas, and other than the uses districts in the non-delineated city planning areas. |
◯
|
Applicable Structures
13m or more height of buildings, or 1,000 m2 or more building area of buildings |
|
|
Major Adjustment Items |
◯
|
Applicable Areas
Urbanization promotion areas, urbanization control areas, and other than the uses districts in the non-delineated city planning areas. |
◯
|
Applicable Structures
13m or more height of buildings, or 1,000 m2 or more building area of buildings |
|
|
Business Operator
|
Planning of a construction plan for large-sized building |
|
↓
|
Advance Consultation with the Relevant Municipal Mayor |
◯
|
Receipt of documents |
|
↓ |
◯
|
Study of building plan (plan adjustment with the business operator) |
|
↓ |
◯
|
Sending to the prefecture with attaching the comments of the municipal mayor |
※
|
When ordinance outlines, etc. are specified in the municipality, an examination based on those are made. |
|
↓
|
Advance Consultation with the Prefecture |
◯
|
Receipt (contact: Area Promotion Section) |
|
↓ |
◯
|
Examination |
|
・General study |
・Hearing to the Land Use Measures Committee Building Adjustment Department |
・Adjustments of instructed items, etc, |
◯
|
Sending the instructed items to the business operator |
◯
|
Individual adjustments based on the instructed items ( business operator) |
◯
|
Building Adjustment Department prior study meeting adjustment |
│
|
↓
|
│
|
◯ Building Adjustment Department adjustment |
│
|
│ ↓
|
│
|
│ ◯Discussion at the Land Use Measures Committee |
↓
|
↓ ↓
|
◯
|
The result of the advance consultation
|
|
↓
|
Notification of the result (completion) of the advance consultation
( via the relevant municipal mayor) |
|
↓
|
|
【Relation with the Advance Consultation Pertaining to Large-sized development Business Plan】
When the size of the development pertaining to a building plan of a large-sized building falls into the advance consultation for a large-sized development plan, the prior instruction guideline concerning land use is applied, and its instruction criteria are applied for the before-mentioned building plan of the (large-sized) building. |