Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations |
Advance Guidelines Concerning Construction of Large-sized Buildings |
When (The timing of procedures) |
When making new construction or extension of buildings, prior to the application or notification pursuant to the rules set forth in the buildings and land use related regulations, etc. |
Who (Procedure Targets) |
Those who intend to construct the buildings of 13 m or higher, or the construction area of 1,000 m2 or larger, in the urbanization promotion areas, the urbanization control areas, or other than the use districts of non-delineated city planning areas stipulated in the city planning.
|
What (Documents) |
Advance Consultation Application listing the building area, height of the buildings, the vacant lot ratio, the width of the greenbelt, etc. and attached documents (location map, copy of the cadastral map. land use plans, etc.)
|
・Advance Consultation Application Concerning Construction of Large-sized Buildings |
|
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
|
・Advance Consultation Application Concerning Construction of Large-sized Buildings |
|
|
Where (Procedure Office) |
Municipal Development Section in charge of the planned site |
How (Examination Contents) |
・Building height : 35 m or lower.
・Vacant lot ratio : 40 % or more.
・Width of greenbelt : 5 m or more.
are examined.
|
|
|
|
Processing Period |
Approximately 2〜3 months (required periods from the submission by the municipality to the prefecture with their comments.) |
Contact for Inquiries |
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section
TEL: 028-623-2194 FAX: 028-623-2199
|