Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations |
Sewage Act |
When (The timing of procedures) |
1. 60 days prior to the installation or modification of specific facilities.
2. 30 days prior to the drainage. |
Who (Procedure Targets) |
1. Those who intend to install or modify specific facilities.
2. Those who intend to drain sewage in the volume (more than 50 m3) and quality as specified by Cabinet Order. |
What (Documents) |
1. Specific Facility Installation Notice, Specific Facility Structure,etc. Modification Notification.
The type, structure, and method of usage of the specific facilities, and the processing of sewage, volume and quality of sewage, etc.
2. Public Sewage Usage Starting Notice.
Volume and quality of water. |
Specific Facility Installation Notice (Form 6) |
|
|
Specific Facility Structure, etc. Modification Notification (Form 8) |
|
|
Public Sewage Usage Starting Notice.(Form 4) |
|
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
|
|
Where (Procedure Office) |
Municipality Section in charge of sewage who controlling sewage. |
How (Examination Contents) |
1. Specific Facility Installation Notice, Specific Facility Structure,etc. Modification Notification.
・To examine if the water quality of the drainage drained to public sewage satisfy the sewage criteria at the outlet to the public sewage.
・If it is recognized not to satisfy the criteria, the change of the planning may be ordered.
2. Public Sewage Usage Starting Notice.
・To check the volume and water quality of drained sewage, and to instruct the installation of facilities for removal of harms when it is required.
|
|
|
|
Processing Period |
Approximately 1 month.(max. 60 days) |
Contact for Inquiries |
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section
TEL: 028-623-2194 FAX: 028-623-2199
|
|