Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations |
Tochigi Prefecture Act Concerning Living Environment Preservations (Specific Pump-up Facilities) |
When (The timing of procedures) |
30 days prior to installation or modification of Specific Pump-up Facilities(pump-up equipment with the sectional area of discharge port exceeding 6cm2 (same here in after)). |
Who
(Procedure Targets) |
Those who intend to install or modify Specific Pump-up Facilities.
※ In the case to install in Ashikaga, Tochigi (former Ohira, Fujioka, Sano (former Sano), Oyama, Shimotsuke, Kaminokawa, and Iwafune.) |
What
(Documents) |
The notification describing the specification of well and pump-up equipment, planned pump-up volume of underground water, measuring method of pump-up volume etc. for the installation of the Specific Pump-up Facilities. |
Please refer to the following website page for the application format, etc. |
・Specific Facilities Installation (use) Notification |
|
Download file is available in Ichitaro for Win format.
If unable to download, please inquire to"Contact for Inquiries". |
|
Where
(Procedure Office) |
Prefectural Environment Forestry Offices or Oyama Environment Control Office Environment Measures Section, via Municipal Environment Conservation Section in charge of the place where the pump-up facilities are located. |
How
(Examination Contents) |
For the notification of installation, to examine whether to comply with the requirements of the notification, and to make receipt when it is recognized to comply. |
|
|
|
Processing Period |
Within 1 month. |
Contact for Inquiries |
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section
TEL: 028-623-2194 FAX: 028-623-2199
|