Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations |
Vibration Regulation Act |
When (The timing of procedures) |
30 days prior to the commencement of installation or modification works of specific facilities (facilities generating vibration).
・7 days prior to the commencement of construction work. |
Who (Procedure Targets) |
・Those who intend to install or modify specific facilities.
・Those who intend to perform the specific construction works at the designated areas. |
What (Documents) |
The notification describing the type of facilities, numbers, and the method of vibration prevention, etc.
|
・Specific Facility Notification
・Specific Construction Works Implementation Notification
|
(To the Ministry of Environment)
|
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
|
|
Where (Procedure Office) |
Municipal Environment Conservation Section in charge, ruling the location of the factory. |
How (Examination Contents) |
To examine whether to comply with the criteria of the regulations, etc., and specific instructions are provided when it is necessary. |
|
|
|
Processing Period |
Approximately 1 month. |
Contact for Inquiries |
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section
TEL: 028-623-2194 FAX: 028-623-2199
|