Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations |
Water Pollution Control Act |
When (The timing of procedures) |
60 days prior to the installation, or modification of specific facilities ( sewage or waste liquid). |
Who (Procedure Targets) |
Those who intend to install or modify specific facilities. |
What (Documents) |
Notification indicating such as the type of facilities, structure, use method, processing method of sewage, etc., polluted level and volume of discharged water.
|
|
|
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
|
|
Where (Procedure Office) |
Prefectural Health Welfare Center Environment Department, via Municipal Environment Conservation Section in charge which ruling the location of the factory.
(in Utsunomiya, City Environment Department Environment Conservation Section) |
How (Examination Contents) |
To examine whether to comply with the criteria of drained water , etc., specific instructions are provided when it is necessary.
|
|
|
Processing Period |
Approximately 2 months |
Contact for Inquiries |
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section
TEL: 028-623-2194 FAX: 028-623-2199
|
|
|