Followings are applicable when procedures based on laws or ordinances, etc. are required.
Name of laws and regulations |
Air Pollution Control Act |
When (The timing of procedures) |
60 days prior to the installation or modification of soot generating facilities, volatile organic compound (VOC) discharging facilities, specific dust generating facilities (for general dust generating facilities, as early as possible prior to the installation or modification). |
Who (Procedure Targets) |
Those who intend to install or modify soot generating facilities, volatile organic compound (VOC) discharging facilities, or specific dust generating facilities. |
What (Documents) |
Notification indicating such as the type of facilities, structure, use method, and processing method. |
1.Soot generating facilities
2.Volatile organic compound (VOC) discharging facilities
3.General dust generating facilities
4.Specific dust generating facilities
|
|
|
Download file is Word97/for Win format.
If unable to download, please inquire to"Contact for Inquiries".
|
|
Where (Procedure Office) |
Prefectural Health Welfare Center Environment Department, via Municipal Environment Conservation Section in charge which ruling the location of the factory.
(in Utsunomiya, City Environment Department Environment Conservation Section) |
How (Examination Contents) |
To examine whether to comply with the criteria, etc., specific instructions are provided when it is necessary. |
|
|
|
Processing Period |
Approximately 2 months |
Contact for Inquiries |
Tochigi Prefecture Department of Industry, Labor and Tourism, International Section
TEL: 028-623-2194 FAX: 028-623-2199
|
|
|